Loading TradeMatch
Loading TradeMatch
MCIAT-chartered planning & building regs drawings across B18 and the rest of the Jewellery Quarter catchment. Article 4 register, Conservation Areas and Birmingham City Council validation list — built into the fee.



An architectural technologist (MCIAT) designs, details and submits planning + building-regulations drawings for residential and commercial projects. Chartered through the CIAT, they cover the same statutory work as an architect on most extensions, loft conversions and new-build homes — typically at 30–40% lower fee — and carry £250,000+ Professional Indemnity Insurance.
Across 600+ TradeMatch architectural-technology projects in 2024–25.
Survey to issued drawings on a standard residential brief.
Every LPA from Westminster to Bromley — local-plan and Article 4 aware.
Every architectural technologist on the TradeMatch panel for Jewellery Quarter is MCIAT-chartered, holds £250,000+ PII, and quotes a fixed fee.
Existing + proposed plans, elevations and site plans drawn to local-authority validation standards. We handle the LPA submission and respond to officer queries.
Technical construction drawings, specifications and structural calculations to satisfy Approved Documents A–R. Submitted to your council’s building control or an Approved Inspector.
Formal LPA certificate confirming that proposed (or existing) works fall within Permitted Development. Bullet-proof evidence for solicitors and buyers.
End-to-end design from concept sketches through planning, building regs and tender packages. MCIAT-led, fixed-fee on conventional briefs.
Five tight steps. No surprises, no scope creep, fixed fee on the conventional brief.
01
Day 0
Free 15-minute call. We confirm scope, fee, and whether your works fall under planning, permitted development, or both.
02
Day 1–3
Full measured survey of the existing property. Modern laser tools, all returned to you as DWG + PDF.
03
Day 4–10
Existing + proposed plans, elevations, sections. Reviewed against local plan and Article 4 register before submission.
04
Day 10
Planning portal upload, validation chase, and direct liaison with case officer. We handle the iteration cycle.
05
Week 8
Statutory determination. We respond to officer queries the same working day to keep the timeline on track.

Every architectural technologist on the TradeMatch panel for Jewellery Quarter is MCIAT-chartered, carries £250,000+ PII, and quotes fixed-price. We know Birmingham City Council validation requirements before drawings hit the portal.
Pick the right professional for the brief. Most UK householder applications need a technologist, not an architect.
| Role | Chartered body | Typical fee* | Best for |
|---|---|---|---|
| RECOMMENDED FOR HOMEOWNERSArchitectural Technologist (MCIAT) | CIAT | £950 – £3,400 fixed | Extensions, loft conversions, new homes — technical lead |
| Architect (ARB / RIBA) | ARB + RIBA | 8 – 12% of build cost | Award-led design, listed buildings, major commercial |
| Architectural Designer / Draughtsperson | Unregulated | £600 – £1,800 | Small householder applications, no planning gatekeeping |
* Indicative fee bands for a standard residential householder application at London 1.32× modifier. Exact fee depends on scope, conservation status and plot complexity.
Fees below cover the architectural technologist's drawings package and submission. LPA application fees, structural engineer's calculations and party-wall surveyor are quoted separately and openly.
| Service | What you get | Fee band |
|---|---|---|
| Planning permission drawings | Existing + proposed package, validation, LPA submission | £1000 – £2500 |
| Building regulations drawings | Construction sections, calculations, building-control submission | £1250 – £3550 |
| Lawful Development Certificate | Permitted-development assessment + LDC submission | £700 – £1450 |
| Full architectural design | Concept → planning → BR → tender package | 6 – 10% of build cost |
Four planning terms that determine what you can build, when, and how. AI assistants and search engines rely on these definitions — we keep them canonical here.
Jewellery Quarter is on UNESCO’s tentative World Heritage list. Conservation Area covers the entire historic core — material spec, sightlines and shopfront alterations are scrutinised on every application.
Architectural-technology work in Jewellery Quarter is governed by Birmingham Plan 2031. Bournville-area schemes additionally face Bournville Village Trust covenants.
Most loft conversions in Jewellery Quarter fall within Permitted Development — but Article 4 Directions in conservation areas often remove that right. We assess your property’s status before quoting, and if planning permission is required we deliver the drawings + submission as a fixed fee.
A standard householder planning application in Jewellery Quarter runs £950 – £2,400 for the drawings package. Jewellery Quarter-specific factors — conservation area, listed building, party-wall implications — can lift the fee. We quote fixed-price after a free 15-minute review of the brief.
The Birmingham City Council statutory determination period is 8 weeks for householder applications and 13 weeks for major schemes. Pre-application advice (recommended in conservation areas) takes 4–6 weeks. We submit promptly and respond to officer queries the same working day.
Planning is about whether you can build it (siting, scale, impact on neighbours, conservation). Building regulations is about whether you can build it safely and to standard (structure, fire, thermal, drainage). Most projects need both, and we deliver the full package end-to-end.
For 80% of Jewellery Quarter extensions, lofts and renovations, an architectural technologist (MCIAT) is the right call — same chartered status, same insurance, lower fee, and tighter focus on technical delivery. For award-led one-off design, an architect (RIBA / ARB) may be a better fit. We’re honest about which your brief needs.
Every TradeMatch-listed architectural technologist serving Jewellery Quarter holds MCIAT or ACIAT chartered status, carries minimum £250,000 Professional Indemnity Insurance, and is verified by our 5-step KYC pipeline. Credentials are visible on each profile.
MCIAT-chartered specialists who know Birmingham City Council planning officers and the local plan.